We offer you a new developed anchorage system with trumpet.
Trumpets as a transition length between bearing plates and ducts will give more safety on strand.
Please take a look of our project pictures, many project already used our methode in Post Tension. Examples: Showroom Car Project, Karet Pedurenan Residence Project, Purus Bridge Project, Vihara Tzu-Chi Project, NTMC Polri Project, Garment Warehouse Project and etc. From all that samples, you can see that our methode can adopted in many project. It means this methode was trusted and safety.
This methode offers the following benefits:
1. Absolutely, give extra power for building, floors, bridge, warehoue and etc.
2. Cost cheaper than other traditional systems.
3. Speed of construction
4. Design Flexibility
5. Durable materials
6. Energy efficient
7. Enviromentally friendly
For Your Information, PCI Involvement in some of this project are:
- Design Proposal of Post-Tensioned Beams
- Supply, Installation, Stressing, and Grouting of BE Post-Tensioned system on beams ad slabs.